T&M Tags 101: The Ultimate Guide to Construction Time and Material Tags

Out-of-scope work is the #1 source of revenue loss and contractor disputes in modern commercial construction. Understanding how to create, verify, and track **Time and Material (T&M) Tags** is essential to protecting your project profit margins.

Published by TrakSlip Editorial8 min read

1. What is a T&M Tag?

A Time and Material (T&M) Tag (also referred to as a T&M slip, field work order, or force account slip) is a written or digital document created on a construction jobsite to record out-of-scope labor, equipment, and material used to perform unbudgeted or extra work requested by the owner or General Contractor (GC).

Crucially, a T&M tag verifies what occurred on site (e.g., 2 electricians working for 4 hours to relocate conduit). It is signed by the superintendent or GC representative to verify that the hours and materials recorded are accurate.

2. T&M Tag vs. Change Order Request (COR): Key Differences

Many field teams confuse T&M tags with formal Change Order Requests. Understanding the distinction is vital for proper billing:

T&M Tag (Field Stage)

  • • Created in the field by foremen
  • • Records physical hours, equipment, and materials
  • • Verifies quantities worked (not dollar amounts)
  • • Signed by GC field superintendent

Change Order Request (Office Stage)

  • • Created in office by project manager
  • • Applies contractual hourly rates & material markups
  • • Calculates exact total dollar value
  • • Formal amendment to project contract

3. The 5 Essential Elements of a High-Quality T&M Tag

When GCs reject T&M tags, it is almost always due to missing information. A legally defensible T&M tag must include:

1

Project & Location Details

Exact project name, job number, grid lines, and room/floor location of the extra work.

2

Itemized Labor Breakdown

Worker names, trade classifications (Foreman, Journeyman, Apprentice), regular vs. overtime hours.

3

Equipment Hours & Rates

Specific machinery utilized (e.g., 40ft Boom Lift) and exact stand-by or active operating hours.

4

Materials & Invoices

Quantities of materials consumed with attached delivery receipts or purchase order slips.

5

Digital Timestamped Signature & Photos

Superintendent signature captured on site, paired with high-res photos of the work site.

4. Why Paper T&M Tags Lead to Lost Revenue

Historically, trade contractors relied on carbon-copy paper clipboards. Industry surveys reveal that paper-based T&M workflows result in:

  • Lost Paperwork: Up to 15% of field tags get misplaced before reaching the accounting department.
  • Sign-off Delays: Foremen fail to catch GCs before they leave site, delaying approvals for weeks.
  • Unreadable Handwriting: illegible hours lead to disputed invoices and trimmed payments.